Image
Paraburdoo Primary Stockpile Wall - Geofabrics Gabion Retaining Wall
Rio Tinto’s Paraburdoo open pit mine which began operations in 1972 is located 80km south of Tom Price in the Pilbara.
Image
Jimblebar Crossing - Geofabrics low level Causeway
BHP Billiton Iron Ore was investigating the blending of ore from all mine sites at Newman. A southern rail turnout across the Fortescue River adjacent to the…
Image
Ti West Coolijarloo
An existing diversion channel which keeps water away from the main barge dredging operation within the mining site was being undermined on the slopes. The area…
Image
East Victoria Water Channel Lining Case Study Cover
One of the local water authorities had an issue with an existing water channel. About eight kilometres of the 42 km channel was leaking due to a lack of…
Image
Hunter Valley Sludge Dewatering Case Study Cover
The Yancoal Australia Hunter Valley Operations (HVO) is a multi-pit open-cut mine producing more than 13 million tonnes of thermal coal and semi-soft coking…
Image
Collinsville Mine Case Study Cover
Stream Diversion Channel Liner and Erosion Control
Image
Mt Kieth Nickle Mine Case Study Cover
The mine treats 6.6 million tonnes of ore at approximately 0.6% nickel per year with the concentrator producing about 144,000 tonnes per year of nickel…
Image
Landfill Rehabilitation Cap Case Study Cover
This project involved the capping of the old Fraser Road Landfill which has been progressively filled with waste over numerous years. As part of the…
Image
Riverview Mining Subsidence Case Study Cover
A service station was proposed to be built in Westphalen Drive, Riverview. A previous mine subsidence report identified the presence of historical mining…
Image
Roseberry Tailings Dam Case Study Cover
As part of long term planning to extend the life of the mine at the Rosebery site, and achieve the best environmental outcomes, MMG engaged ATC Williams to…